CMS successfully excavated and backfilled for 20,000+ linear feet of various utilities and utility tie-ins including water, storm and sanity drains. Maintaining up to 3 crews at any given time, CMS worked closely with the mechanical contractor to get the job done.

Tools & Equipment

  • 34,000 lb. Excavator
  • 19,000 lb. Excavator
  • Compact Track Loader
  • Dump Truck
  • Smooth Drum Roller

Completion Date

2014